Trigger-to-retrieval timing & discrepancy follow-up
Walkthrough cast: Elena Rivera, Dr. Mira Lee, Nora Ruiz, RN & Alex Kim, RN
Published basis: ESHRE Ovarian Stimulation Guideline (v2.3, Sept 2026) and NICE NG257 (March 2026) on 35–36h trigger intervals.
Product hypothesis: Preserve both planned (20:00 PDT, version 3) and patient-reported (20:20 PDT, received at 20:22 PDT) times with explicit UTC offsets across daylight saving time for the Nov 1, 07:00 PST retrieval, retire superseded version 2 (20:30 PDT), and require explicit on-call nurse acceptance.
OHSS freeze-all pivot, anesthesia readiness & discharge ownership
Walkthrough cast: Elena Rivera, Dr. Mira Lee & Nora Ruiz, RN
Published basis: ASRM OHSS Guideline (2023/2024) and ASA Multi-Society GLP-1 Perioperative Guidance (Oct 2024).
Product hypothesis: Surface preoperative medication hold checks on the retrieval readiness gate, cancel fresh-transfer tasks immediately upon a freeze-all decision, and require a named post-op discharge owner.
Reciprocal IVF separate roles, embryo warming & OB graduation
Walkthrough cast: Avery & Sam, Dr. Priya Shah & Embryology team
Published basis: ASRM Ethics/Practice guidance on LGBTQ+ family building (2026) and SMFM Consult Series #60 on ART pregnancies.
Product hypothesis: Keep egg-source and gestational-carrier charts separate under Role × Relationship × Task access rules, verify multi-party warming consent, and keep OB graduation open until the receiving team accepts.
Early PGT-M preparation, lot traceability & downtime recovery
Walkthrough cast: Jordan Patel & Embryology / Nursing team
Published basis: ASRM PGT-M Opinion (2023), US medical-device culture-media recall records (2024), and ONC SAFER Contingency Guide (2024/2025).
Product hypothesis: Track familial probe build before cycle day one, link reagent lots across cases for rapid exposure review, and enforce line-by-line paper-to-chart reconciliation after EMR outages.